Base Flow assisted American Rivers and Littleton Water & Light with a current condition assessment and 15% conceptual removal designs for Littleton Reservoir Dam located in Bethlehem, New Hampshire. A topographic survey including a detailed longitudinal profile and cross sections provided essential data to assess potential vertical and lateral channel adjustment post-dam removal. The profile was also used to assess fish passage and estimate impounded sediment volume, and was compared to similar data collected under a previous study. Additional data collected during site inspections supported the development of a conceptual removal design and an opinion of probable construction cost (OPCC). An inventory of pool depths was collected to estimate the systems ability to scour and further assess post-dam removal channel adjustment, to inform resetting of an existing infiltration gallery that supplies water to the Town.


LITTLETON RESERVOIR DAM REMOVAL








BASE FLOW, LLC
Aspiring to work with nature to help clients solve problems and improve ecological conditions on land and in water.
Address
© 2026. All rights reserved.
12 Middle Street, Suite 7A
Amherst, NH 03031
Website Design by Martyras Media
